Pre-feasibility study on Battery Swapping Systems (BSS) model for Electric 2-wheelers in Lao PDR
Nov / 2022

Project Name: Pre-feasibility study on Battery Swapping Systems (BSS) model for Electric 2-wheelers in Lao PDR

Project Narrative

Project Background and Objectives
The number of registered vehicles in Lao PDR increased drastically from 367,900 in year 2004 to 2,133,500 in year 2017 (+480%), while transport fuel consumption grew from 855 million liters in 2013 to 1,442 million liters in 2016. Gasoline motorcycles are the primary mode of transport, accounting for 67% of daily trip in Vientiane Capital. The Government of Lao PDR (GoL) has set the objective of transitioning to e-mobility in the transport sector as a priority in the National Green Growth Strategy, the 9th National Social Economic Development Plan (2021-2025) as well as in 2021 Nationally Determined Contribution (NDC) update. GoL’s target is to achieve 30% Electric Vehicles penetration including 2-wheelers and passengers’ cars in national vehicles mix by 2030. GGGI is supporting the GoL in accelerating the use of Electric Vehicles in the country, including through the origination and preparation of bankable project opportunities, the mobilization of private sector investment, and the development of a robust EV ecosystem.

Fund Sources

Global Green Growth Institute (GGGI)

Overall Contract Amount

Project Owner / Counter Part

Global Green Growth Institute (GGGI)

Associated Firm / Partner

PricewaterhouseCoopers Private Limited

What Mekong consultant Co., Ltd contributes

Providing Project Manager:
• Overall responsible for coordinating the project in all locations and for all functions
• Ensure timeliness and adequacy of deliverables
• Address cross-application and integration issues within the scope of the project
• Secure the appropriate resources for the project at the right time
• Track / monitor project, control the project and report progress on a regular basis against budget, schedule and quality targets. 
• Project completion, jointly
• Liaison with entities external to the project
• Hold regular meetings with the lead consultants to identify and resolve business and technical issues arising from the project
• Implement quality assurance and control procedures ensuring that any action resulting from quality assessments are implemented
• Work to ensure that the scope is effectively controlled in accordance with the project definition

Location

Vientiane Capital, LPDR

Duration

Jan. 2022 – Mar. 2022

Project Status under Mekong Consultants Co., Ltd
>>Completed<<